| SUMMARY: | UHM: Electrical Power Outage Scheduled on December 22, 2012 |
| POSTED ON: | 12/05/2012 |
| REPORTER: | Janice A Kawachi (kawachi) |
| START TIME: | Dec 22 07:30 AM |
| END TIME: | Dec 22 03:30 PM |
| DESCRIPTION: |
Electrical power outages are scheduled on December 22, 2012 as follows:
No power from 7:00 a.m. to 3:30 p.m. for the following buildings: Bilger Addition Bilger Hall Also the network connections to the following buildings will be affected: Buildings and Grounds Campus Security Center for Korean Studies Credit Union Bldg. Dive Safety Energy House Environmental Health and Safety KHET (media lab) Krauss Annex Krauss Annex 19 Kuykendall Annex Lab School Lockers Landscaping Lincoln Annex Maile Way Parking Kiosk Pope Lab Temporary Portable Transportation No power from 7:30 a.m. to 8:15 a.m. for the following buildings: Andrews Amphitheatre Art Building Building 37 HIG (New) IT Building Construction Site Krauss Annex Krauss Annex 19 Krauss Hall Kuykendall Annex Kuykendall Hall Sakamaki Hall No power from 9:00 a.m. to 9:45 a.m. for the following buildings: Administrative Services Building II Architecture Building Bachman Annexes 2, 6, 9, 10, 11, 12, 13 Everly Hall Gartley Hall Construction Site Multi-Purpose Building Sinclair Annexes Sinclair Library UHS 1, 2, 3 University Avenue Portables Wist Annex Wist Hall No power from 10:30 a.m. to 11:40 a.m. for the following buildings: Agricultural Engineering Building Edmondson Hall Construction Site Gilmore Hall Hamilton Library, Phase III Maile Way Portable #2 Snyder Hall Spalding Hall Webster Hall These outages are necessary to facilitate ongoing construction projects including the Sinclair Library Basement renovation work, the new IT Building, the renovation of Edmondson Hall and the installation of new metering equipment at various building on campus. |