UHM: Scheduled Power Outages on August 17, 2013

SUMMARY: UHM: Scheduled Power Outages on August 17, 2013
POSTED ON: 08/10/2013
REPORTER: Janice A Kawachi (kawachi)
START TIME: Aug 17 07:15 AM
END TIME: Aug 17 06:30 PM
DESCRIPTION: Electrical power outages are scheduled on August 17, 2013 as follows:

No electrical power from 6:00 a.m. to 2:30 p.m. for Sakamaki Hall.

No electrical power from 7:15 a.m. to 6:30 p.m. for the following buildings:

Administrative Services Building II
Architecture Building
Bachman Annex 2
Bachman Annex 6

No electrical power from 7:15 a.m. to 8:00 a.m. for the following buildings:

Bachman Annexes 9, 10, 11, 12, 13
Bachman Hall
Everly Hall
Multi-Purpose Building
Sinclair Annexes
Sinclair Library
University Avenue Portables
UHS 1, 2, 3
Wist Annex
Wist Hall

No electrical power from 9:00 a.m. to 1:00 p.m. for Bilger Hall.


These outages are necessary to facilitate electrical work for the renovation of Gartley Hall, and the installation of metering equipment for the Bilger Hall Power and Lighting Upgrade project.