MyUH front-end (lum45/t2k30) moving from Keller to ITC (2 of 2)

SUMMARY: MyUH front-end (lum45/t2k30) moving from Keller to ITC (2 of 2)
POSTED ON: 11/13/2014
REPORTER: Chase Kawakami (chasek)
START TIME: Nov 20 02:00 AM
END TIME: Nov 20 11:00 AM
DESCRIPTION: Moving the second of the two load-balanced MyUH front-end servers, lum45/t2k30 from Keller to the ITC Data Center. The other MyUH front-end server, lum46/t2k31 is scheduled to be moved on Wednesday, November 19, 2014 and will remain up in ITC during the move, allowing MyUH to remain available.
UPDATE:11/20/2014 09:42 AM: Ticket closed by chasek
11/20/2014 09:41 AM: lum45/t2k30 moved from Keller to ITC and back in the load balancer, accepting MyUH logins as of 9:18AM.